KARABALTA WATER REHABILITATION PROJECT: PIU SUPPORT INCLUDING ENGINEERING, DESIGN AND CONTRACTS SUPERVISION, European Bank for Reconstruction and Developement (2013-2016)


The overall objective of the assignment is to facilitate the timely and effective implementation of the Project by rendering assistance to the PIU in the project implementation, including design, all aspects of procurement and disbursement, as well as environmental and social management systems and practices in line with EBRD’s requirements, taking into account gender issues.

The services include:

1.       Overall Project management support;

2.       Design the works and prepare technical specifications for goods;

3.       Arrangement of preparation of the prequalification, if any, and tender documents for procurement of works and goods;

4.       Arrangement of the tendering procedure for works and goods, including evaluation of tenders and drafting tender evaluation reports;

5.       Arrangement of timely disbursement under the contracts.

Support the lead partner Fichtner, Germany in carrying out all above tasks. In total 52 man months of local input will be provided to cover: Design and prepare the technical specifications; Assist the PIU in drafting tender documents, carrying out tender procedure, preparing evaluation report and contract, and submit the necessary documents to the EBRD, when requesting the issue of “no objection” as required; Development of PIU operating procedures; development of Financial Management System; Obtaining of approvals by authorities; assuring compliance with local legislation and EBRD requirements, etc.